Pilot 10. Clean hydrogen production for industrial and mobility demand

Scope:

Building the foundations for regional hydrogen deployment

A wide range of infrastructures will be developed, including a 10 MW PEM electrolyzer powered by an 18.75 MWp solar PV plant, a control building, multiple hydrogen storage systems with fiberglass tanks and buffer units, compression stations with built-in redundancy, and a dispatch area. The hydrogen – up to 1,600 tonnes/year – will be used for industrial processes, vehicle refuelling, and injection into the gas grid, marking a key step toward large-scale, regional hydrogen deployment.

 

Pilots

Meet other pilots